Code of Colorado Regulations · 2 CCR 404-1
PRACTICE AND PROCEDURE 2 CCR 404-1
View official source ↗A preview of Code of Colorado Regulations · 2 CCR 404-1 — its structure, and a few AI-generated plain-English summaries. The full cross-referenced text is available to subscribers.
What's inside
- Appendix IIIFEE STRUCTURE
- Appendix VIList of Public Water Systems Subject to Protections of Rule 317B
- Appendix VIIHigh Priority Habitat Maps
- Appendix IXFORM 41
Plain-English summaries
Code of Colorado Regulations · 2 CCR 404-1
PRACTICE AND PROCEDURE 2 CCR 404-1
This document is the set of regulations in 2 CCR 404-1, Practice and Procedure, and the text refers to the Energy and Carbon Management Commission. The regulations cover definitions, general provisions, permitting, operations and reporting, rules of practice and procedure, safety and facility operations, financial assurance, underground injection, environmental impact prevention, reclamation, flowlines, protection of wildlife resources, deep geothermal operations, and Class VI UIC. Appendices include a fee structure listing $0 for each item, a list of public water systems, high priority habitat maps, and a trade secret claim form (Form 41).
100 Series — ABANDONED WELL
ABANDONED WELL
A well is considered abandoned if its use has been permanently stopped, or if it's in such bad condition that it can't be used for its original purpose or even for observation.
100 Series — ALLOCATED GEOTHERMAL RESOURCE
ALLOCATED GEOTHERMAL RESOURCE
This is a definition. An Allocated Geothermal Resource is any geothermal resource that is associated with nontributary groundwater, but it does not include groundwater in the Denver Basin Aquifers.
100 Series — ANCILLARY HEAT PRODUCTION
ANCILLARY HEAT PRODUCTION
Definition: Ancillary heat production is using heat from produced fluids at an oil and gas operation to cut emissions at the same location where the well is, and only when that heat wouldn't make economic sense as a standalone geothermal project.
100 Series — ANNULAR OVER-PRESSURIZATION
ANNULAR OVER-PRESSURIZATION
Annular over-pressurization is when fluids trapped between the surface casing and the intermediate or production casings build up enough pressure that they might leak or migrate out of that annular space.
Read the full text of Code of Colorado Regulations · 2 CCR 404-1
Subscribers get the full text, linked cross-references, and plain-English summaries as they pass the automated check against source text — $10 / month or $100 / year.