EssentialRegs

Regulation 25

II.F.5.c.(i).(B).

PART B — Surface Coating, Solvents, Asphalt, Graphic Arts and Printing, and Pharmaceuticals › II. Solvent Use › II.F. General Solvent Use › II.F.5. Monitoring requirements

Regulation 25 II.F.5.c.(i).(B). is in the full corpus.

Start your 7-day trial to open it in the cross-referenced reader.

Code of Colorado Regulations · Regulation Number 25

CONTROL OF EMISSIONS FROM SURFACE COATING, SOLVENTS, ASPHALT, GRAPHIC ARTS AND PRINTING, AND PHARMACEUTICALS 5 CCR 1001-29

View official source ↗

A preview of Code of Colorado Regulations · Regulation Number 25 — its structure, and a few AI-generated plain-English summaries. The full cross-referenced text is available to subscribers.

What's inside

  • PART AApplicability and General Provisions
  • Appendix AColorado Ozone Nonattainment or Attainment Maintenance Areas
  • PART BSurface Coating, Solvents, Asphalt, Graphic Arts and Printing, and Pharmaceuticals
  • Appendix DMinimum Cooling Capacities for Refrigerated Freeboard Chillers on Vapor Degreasers
  • Appendix EEmission Limit Conversion Procedure
  • PART CStatements of Basis, Specific Statutory Authority and Purpose

Plain-English summaries

Code of Colorado Regulations · Regulation Number 25

CONTROL OF EMISSIONS FROM SURFACE COATING, SOLVENTS, ASPHALT, GRAPHIC ARTS AND PRINTING, AND PHARMACEUTICALS 5 CCR 1001-29

Regulation Number 25 covers control of emissions from surface coating, solvents, asphalt, graphic arts and printing, and pharmaceuticals. Part A covers applicability and general provisions, and Appendix A concerns Colorado ozone nonattainment or attainment maintenance areas. Part B covers surface coating, solvents, asphalt, graphic arts and printing, and pharmaceuticals, and includes appendices on minimum cooling capacities for refrigerated freeboard chillers on vapor degreasers (Appendix D) and an emission limit conversion procedure (Appendix E). Part C contains statements of basis, specific statutory authority and purpose.

I.A.1.a.

This regulation applies to the Denver 1-hour ozone attainment/maintenance area, any nonattainment area for the 1-hour ozone standard, the 8-hour Ozone Control Area, and northern Weld County.

I.A.1.b.

This is a state-only provision. All provisions of Regulation Number 25 apply to any ozone nonattainment area in Colorado, meaning areas designated nonattainment for either the 1-hour or 8-hour ozone standard, unless Section I.A.1.c. says otherwise. Appendix A of this regulation identifies Colorado's ozone nonattainment or attainment maintenance area maps and chronologies of attainment status.

I.B.1.a.

A new source in the 1-hour ozone nonattainment area or attainment maintenance area is any source that either submitted a complete permit application on or after October 30, 1989, or, if no permit is required, commenced operation on or after October 30, 1989. These new sources must comply with this regulation when they start operating.

I.B.1.b.

(State Only) A new source is any source that started construction on or after the date its area was first designated ozone nonattainment, or if in the 1-hour ozone nonattainment or attainment maintenance area, by October 30, 1989. New sources must comply by whichever is later: October 30, 1989 (if in the former 1-hour ozone nonattainment or attainment maintenance area); February 1, 2009 (if in the 8-Hour Ozone Control Area but outside the 1-hour area); or upon commencement of operation (if in an ozone nonattainment or attainment maintenance area).

Read the full text of Code of Colorado Regulations · Regulation Number 25

Subscribers get the full text, linked cross-references, and plain-English summaries as they pass the automated check against source text — $10 / month or $100 / year.